Laserfiche WebLink
Photos <br />Pre and Post Construction <br />Figures <br />Table of Contents <br />Figure -1 May Day No. 1 "As- Built" Topography <br />Attachment 2- General Site Location <br />Attachment 2 -Site Topography <br />Attachments 2 <br />Attachment 1- Gonzales -Headwall Collapse Assessment March 31, 2011 <br />Attachment 2- Technical Revision No. 1 -May Day No. 1 Work plan- March 3.02.2012 <br />Attachment 3 -Approved May Day No. 1 May Day No. 1 Work Plan <br />Attachment 4 -Geotechnical Design Components <br />Attachment 5 -Headwall Stabilization —Franklin Drilling & Blasting Inc. <br />Attachment 6 - Implemented Study for Cursory Geotechnical Consultation and Study for <br />the Mayday Mine Headwall Stabilization Project, Hesperus, Colorado <br />Attachment 7 -Portal Steel Set Design-Melcher Construction Notes <br />Wildcat Mining Corporation <br />May Day and Idaho Mine and Mill Application <br />112(d) Permit— Technical Revision No. I <br />May Day and Idaho Mine <br />M-1981-185 <br />Revised June 30th, 2016 <br />