Laserfiche WebLink
Idaho Parcels: Section 21, Township 36N, Range 11 W, N.M.P.M. <br />Parcel Number <br />Legal Summary <br />Acres <br />5601-214-00-012 <br />PAT: IDAHO MILLSITE (18320): IDAHO 1&2&ALPINE <br />141.5 <br />(18321) *PAT: LORDKITCHENER&HARTFORD (17108): <br />GERTRUDE (16616) *PAT: GOOD HOPES & SUNRISE <br />(17124): CATHRYN (16616): *PAT: MIDNIGHT & <br />MIDNIGHT 2 (19646): HELEN (19515): *PAT: PAY DAY <br />(19516 A) & PAY DAY MILLSITE (19516 B) <br />Idaho Total Acreage: <br />141.5 <br />Total Acreage: 295.79 acres <br />6.4.1(1) Affected Land <br />The May Day Idaho Mine Complex permit boundary is comprised of 295.79 acres of which 45.7 acres are <br />affected directly or indirectly by proposed mining activities. The township and range of the permit <br />boundary is in Section 21 and Section 28, T36N, R1IW, N.M.P.M. See Figure A-1. <br />The main entrance to the May Day Idaho Mine Complex Universal Transverse Mercator (UTM) Grid is <br />12 S 758992 4137578. <br />The May Day Idaho Mine Complex includes the following affected lands: <br />May Day No. 1, May Day No. 1 East, May Day No. 2, May Day No. 2 East, May Day No. 3, Pay <br />Day Idaho, Chief, La Plata River Bridge, Base of Operations, Pre -Existing Roads, New Access <br />Road and designated buffer zones within the identified permit boundary. <br />Sunrise Mining, LLC ("Sunrise") has acquired (via ownership of La Plata County Land, LLC) or <br />leased the following legal descriptions for these affected areas: <br />May Day No. 1: a tract of land located in Section 28, T36N, RI IW, N.M.P.M. and being more <br />particularly described as follows: beginning at a point from which the WIA corner of said <br />Section 28 bears S 70°58'59"W a distance of 3268.40 feet, Thence, N 33°15'W a distance of <br />300.0 feet, Thence N 56°45 E a distance of 500.0 feet, Thence S 33°15'E a distance of 300.0 feet, <br />Thence S 56°45'W a distance of 500.0 feet, to the point of beginning and containing 3.2 acres. <br />May Day No. 1 East: May Day No. 1 East is illustrated on Figure D-4 and being considered to <br />store run -of -mine rock from the May Day No. 1. The total affected land including buffer is 0.8 <br />acres. <br />May Day No. 2: a tract of land located in Section 28, T36N, R1IW, N.M.P.M., and being more <br />particularly described as follows: beginning at a point from which the WIA corner of said <br />Section 28 bears S 82'30'14"W a distance of 2299. 7 feet, Thence, N a distance of 380 feet, <br />2 <br />