My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-03_HYDROLOGY - M1977208
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977208
>
2017-10-03_HYDROLOGY - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 10:27:14 PM
Creation date
10/4/2017 3:45:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
HYDROLOGY
Doc Date
10/3/2017
Doc Name Note
Technical Revision Revised Plan
Doc Name
Water Level Monitoring
From
CEMEX Building a Better Future
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZZCcMEX <br /> RECEIVED <br /> Building a better future r,OCT U 3 2017 <br /> October 2, 2017 DMSION OF RECLAMATION <br /> MINING AND SAFETY <br /> Amy Eschberger Via FEDEX <br /> Division of Reclamation, Mining and Safety TRK 7703 0772 2458 <br /> Environmental Protection Specialist <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> 1 <br /> Re: CEMEX Lyons Mine Permit M-1977-208 <br /> Technical Revision No. 12, Revised Groundwater Monitoring Plan 1 <br /> Third Quarter 2017 Monitoring Data <br /> Dear Amy Eschberger: <br /> This letter transmits the surface water and groundwater data associated with the sampling of the <br /> cement kiln dust disposal area (C-Pit). This report includes data from the C-Pit ponded water and <br /> related groundwater monitoring for the third quarter of 2017, covering the reporting period from June <br /> 31, 2017 to September 30, 2017. Table 1 presents data for the last four quarters. <br /> Compliance monitoring water samples were collected on July 3, 2017 from the CEM-oo1 and CEM-004 <br /> groundwater monitoring wells, and from the C-Pit ponded water. The inspection of groundwater <br /> monitoring well CEM-oo5 on July 3, 2017 indicated that there was not enough water volume to collect <br /> a representative sample. <br /> The samples collected from C-Pit ponded water and the groundwater monitoring wells were analyzed <br /> for pH, chloride, sulfate,total dissolved solids, selenium, and thallium.The reported pH data is based <br /> on the pH analysis performed at the time of sample collection in the field (Table 1). The measured pH <br /> at groundwater monitoring well CEM-004 and analytical results for chloride, sulfate,total dissolved <br /> solids(TDS), selenium and thallium from the July 3, 2017 groundwater sample were within the target <br /> levels prescribed by TR-12, as shown in Table 1. <br /> In addition, a Stiff Diagram of the groundwater cation/anion data from CEM-004 compared to the <br /> average and got" percentile of the cation/anion concentrations from the last four quarterly samples of <br /> C-Pit data is provided in Figure 1 for reference. As shown in Figure 1 and consistent with past reports, <br /> the signature for CEM-004 continues to be significantly different from that of C-Pit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.