Laserfiche WebLink
9-26-17 — East Taylor Fill looking southeast from the Ridge Road <br />I am a Registered Professional Engineer in the State of Colorado. Being familiar with the <br />Colowyo operation, and relying on the information provided to me by Colowyo Personnel, the <br />construction activities related to the West and East Taylor Fill are in conformance, to the best of <br />my knowledge and experience, as specified in the Introductory pages and the associated report <br />found in Volume 13, Exhibit 21, Item 1, and other applicable requirements of the approved <br />permit documents, a portion of CDRMS Permit C-1981-019. <br />��� •••••• ••••���" ��♦i <br />i <br />• <br />S 47031 <br />- _ <br />•• <br />