My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-26_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2017-09-26_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2017 8:49:49 AM
Creation date
10/3/2017 7:38:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
9/26/2017
Doc Name
Quarterly Fill Inspection Report
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Annual Report Year
2017
Report Quarter_Month
3
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT - SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER 1ST11 2ND ❑ 3RD X 4T" ❑ 2017 <br />YEAR <br />ALL QUARTERS NEED TO BE CERTIFIED <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No NA Yes <br />If yes, explain: <br />Date of Survey: NA <br />Reviewed By: Lee Sampson, Kurt Blunt <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 224.2 feet If yes, explain: <br />Date of Measurement: 9-26-17 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 9-26-17 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 9-26-17 <br />Inspected By: Lee Sampson, KurtBlunt <br />i <br />i <br />47031 <br />9-26 /7: <br />- <br />oo <br />I am a Registered Professional Engineer in the State of Colorado. Being familiar with the Colowyo operation, and relying on the <br />information provided to me by Colowyo Personnel, the West and East Taylor Fill are observed to be stable, at the time of inspection. <br />Construction activities related to the West and East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1, and other applicable <br />requirements of the approved permit documents, a portion of CDRMS Permit C-1981-019. <br />
The URL can be used to link to this page
Your browser does not support the video tag.