My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-02_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2017-10-02_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2017 11:19:27 AM
Creation date
10/2/2017 3:47:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
10/2/2017
Doc Name
Request for Technical Revision
From
American Gypsum Company
To
DRMS
Type & Sequence
TR10
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`I <br />AMERICAN <br />GYPSUM <br />September 28, 2017 <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203 <br />Attn: Travis Marshall <br />Please find enclosed a Request for Technical Revision (TR) Cover Sheet, eight plan and <br />profile sheets, and a check for the required fee. The TR includes an updated operations and <br />reclamation plan for the West (Lower) Pit at the Eagle -Gypsum Mine, CDRMS Permit M-1984-041, <br />in Eagle County. <br />The TR will allow an additional 100 vertical feet of gypsum ore to be recovered in the West <br />Pit and the original highwall and final pit to be backfilled to a 3:1 slope or flatter. No new surface <br />disturbance will be required to accommodate this TR. No update to the current SWMP plan will be <br />required and stormwater will continue to be contained within the West Pit. The proposed access <br />road will be constructed within the proposed reclamation area, designed for a perfect cut/fill balance <br />to final reclamation, and will be graded after the final pit is backfilled. Waste material from Upper <br />Pit operations will be hauled in to backfill the final West Pit. <br />Except those updates listed above, and in the attached plan and profile sheets, the Eagle - <br />Gypsum Mine will continue to follow the stipulations outlined in the original approval. <br />Yours very truly, <br />Jared D. ea <br />Mine Manager <br />American Gypsum Company 740 1 lighway 6 PO BOX 980 Gypsum. CO 81637 - Cell 970-306-5463 - Plant 970-524-8103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.