My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REPORT - M2007042
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007042
>
2017-09-28_REPORT - M2007042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2017 9:41:35 AM
Creation date
9/29/2017 1:16:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007042
IBM Index Class Name
REPORT
Doc Date
9/28/2017
Doc Name Note
No Map
Doc Name
Annual Fee/Report/Map
From
H/S Properties
To
DRMS
Annual Report Year
2017
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: '��n� seeded w/ Npr,� w/topsoil 11 tont, mulched w/ �a�t <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: I ►0r,c fertilized w/ N p,1e_, replacement ' Or,t, rate(tons/ac): 40 vl <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application , application FiCt ..A--- application Ho i 1e_ <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO ek <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO N/A <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO 4301 <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office o-ate <br /> Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO 6D <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? 4111b NO N/A <br /> 19. Is your basis for legal right to enter still valid? ES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> e <br /> MAP ATTACHED: ,Inc \,_� �j 4 x <br /> , , W\ ,ft) ct Cil 1\/v t%O_L5 1l',c <br /> 6,-.,..0„. -1\, en.-1) .4s-aA u....71. 5 4,-,,,...voop,,..--\-1*,_(--9 t„s Ak., iLz <br /> CSI` ?ne,..ki <br /> allt ‘,5„, r <br />
The URL can be used to link to this page
Your browser does not support the video tag.