My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_PERMIT FILE - C1981041 (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2017-01-30_PERMIT FILE - C1981041 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 10:00:10 AM
Creation date
9/28/2017 8:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
1/30/2017
Doc Name
April 2016 Electrical Resistibity Tomography Survey Investigation
Section_Exhibit Name
Tab 14 Appendix 14-14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Repair and Reclamation Cost Estimate TR-69 <br />Quantity <br />Unit <br />Unit Price <br />Estimate <br />Mobilization & Demobilization <br />1 <br />LS <br />$ <br />10,000 <br />$ 10,000 <br />Topsoil Salvage <br />325 <br />CY <br />Supervisor <br />8 <br />HRS <br />$ <br />45 <br />$ <br />360 <br />Front End Loader <br />4 <br />HRS <br />$ <br />75 <br />$ <br />300 <br />Motor Grader <br />4 <br />HRS <br />$ <br />75 <br />$ <br />300 <br />Excavation <br />1100 <br />CY <br />Supervisor <br />16 <br />HRS <br />$ <br />45 <br />$ <br />720 <br />Backhoe 200 JD <br />16 <br />HRS <br />$ <br />115 <br />$ <br />1,840 <br />Front End Loader <br />16 <br />HRS <br />$ <br />75 <br />$ <br />1,200 <br />Water Truck <br />6 <br />HRS <br />$ <br />65 <br />$ <br />390 <br />Place and Compact Backfill <br />1100 <br />CY <br />Supervisor <br />32 <br />HRS <br />$ <br />45 <br />$ <br />1,440 <br />Backhoe 200 JD <br />32 <br />HRS <br />$ <br />115 <br />$ <br />3,680 <br />Front End Loader <br />32 <br />HRS <br />$ <br />75 <br />$ <br />2,400 <br />Water Truck <br />16 <br />HRS <br />$ <br />65 <br />$ <br />1,040 <br />Compactor <br />32 <br />HRS <br />$ <br />120 <br />$ <br />3,840 <br />Replace Topsoil <br />325 <br />CY <br />Supervisor <br />8 <br />HRS <br />$ <br />45 <br />$ <br />360 <br />Front End Loader <br />4 <br />HRS <br />$ <br />75 <br />$ <br />300 <br />Motor Grader <br />4 <br />HRS <br />$ <br />75 <br />$ <br />300 <br />Shaft in Carey's Pond <br />Supervisor <br />8 <br />Hrs <br />$ <br />45 <br />$ <br />360 <br />Backhoe 200 JD <br />8 <br />Hrs <br />$ <br />115 <br />$ <br />920 <br />Materials <br />Concrete Slab over shaft <br />15 <br />CY <br />$ <br />400 <br />$ <br />6,000 <br />Bentonite (Super Sacks) <br />12 <br />Tons <br />$ <br />800 <br />$ <br />9,600 <br />Seed and Mulch <br />Seed <br />0.4 <br />AC <br />$ <br />325 <br />$ <br />130 <br />Drill Seed <br />0.4 <br />AC <br />$ <br />500 <br />$ <br />200 <br />Hydro Mulch <br />0.4 <br />AC <br />$ <br />1,500 <br />$ <br />600 <br />Total Estimated Cost <br />$ 45,350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.