My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-27_REPORT - M2006013
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006013
>
2017-09-27_REPORT - M2006013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:27:50 PM
Creation date
9/27/2017 11:30:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006013
IBM Index Class Name
REPORT
Doc Date
9/27/2017
Doc Name
Annual Fee/Report/Map
From
Eastern Colorado Aggregates
To
DRMS
Annual Report Year
2017
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: Z <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ O w/topsoil mulched w/ <br /> approved mix: replaced: proved mulch: U <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 0 fertilized w/ O replacement O rate(tons/ac): <br /> a vd fertilizers depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application A <br /> method: A method: I N N method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YE$ NO N/A <br /> If"YES",indicate the w/eed/j species, control area,control type, application rate an treatment date on the report map. <br /> /e"I ci/ r`5 c- U N d /'Cil5>r�.J U/i V i ��;�•�,. .� /,, /,c 1 /1 -y l� <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit`s �a" NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? (YES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the ate <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO (/AJ) <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? jYE� NO N/A <br /> 19. Is your basis for legal right to enter still valid? YES, NO <br /> 20. Does your permit require you to submit monitoring information annually? YES (-NO, N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7-12 and 14. UPDATED <br /> MAP ATTACHED: �\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.