Laserfiche WebLink
Tab 14 <br />List of Appendices (continued) <br />14-14 April 2016 ERT Investigation — Huddleston-Berry/Fugro Consultants <br />Reports <br />14-15 August 2016 ERT Investigation — Huddleston-Berry/Fugro Consultants <br />Reports <br />14-16 Sampling of Small Areas <br />RS -11-008 <br />6C <br />6C -A <br />7C <br />8C <br />9C <br />10C <br />11C <br />12C <br />13C <br />6D <br />8D <br />11D <br />26 <br />27 <br />28 <br />CMC Mining Inc. <br />59 <br />List of Exhibits <br />Roadside Mine Revegetation Field Trials of Refuse Pile <br />Roadside Mine -Post Mining Topography <br />Active Area/Alternative Land Use <br />Overland Conveyor -Post Mining Topography <br />Cameo No. 1 Mine -Post Mining Topography <br />Cameo Refuse Disposal Area -Post Mining Topography <br />Railroad Spur & Overland Conveyor -Post Mining Topography <br />Unit Train Loadout Facility -Post Mining Topography <br />North Decline -Post Mining Topography <br />North West Intake Post Mining Topography <br />Roadside South Portal (January 20, 1977 Contours) <br />Roadside North Portal (May, 1977 Contours) <br />Unit Train Loading Facility (January 20, 1977 Contours) <br />Roadside Mine Cross Sections <br />Cameo No. 1 Mine Cross Sections <br />North Decline Cross Sections <br />January 20,1975 -Topography Map (MR05,Vol 7) <br />Unit Train Loading Facility <br />TR -69 (Rev 12/16) <br />