My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-26_REVISION - C1981013 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2017-09-26_REVISION - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 9:06:04 AM
Creation date
9/26/2017 8:55:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
9/26/2017
Doc Name
Completeness Letter
From
DRMS
To
Office of Surface Mining
Type & Sequence
SL7
Email Name
rdz
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />September 26, 2017 <br /> <br />Howard Strand <br />Office of Surface Mining <br />Western Region <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202 <br /> <br /> <br />Re: Golden Eagle Mine (Permit No. C-1981-013) <br /> Bond Release Application No. 7 (SL-7) <br /> <br /> <br />Dear Mr. Strand: <br /> <br />New Elk Coal Company, LLC has applied for a bond release at the Golden Eagle Mine. The <br />bond release application was found complete by this Division on September 26, 2017. The SL - <br />07 application is the proposed final bond release for the Golden Eagle Mine. If approved, this <br />permitting action will terminate the jurisdiction of the Division of Reclamation, Mining and <br />Safety at the Golden Eagle Mine. The surface ownership is private, and the coal mined was <br />private. <br /> <br />We will contact you to advise you of the Division's required bond release inspection of the site as <br />soon as it has been scheduled. A proposed decision on the application will be issued within sixty <br />(60) days of our inspection. <br /> <br />If you have questions or need additional information, please contact me. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br /> <br />Robert D. Zuber, P.E. <br />Environmental Protection Specialist <br />Rob.zuber@state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.