My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-22_GENERAL DOCUMENTS - M2001005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2001005
>
2017-09-22_GENERAL DOCUMENTS - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 9:27:46 AM
Creation date
9/25/2017 3:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
General Documents
Doc Date
9/22/2017
Doc Name
Request to Import Fill
From
Transit Mix Concrete
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATION: <br /> U Ve, , herby certify that the material proposed to be <br /> imported to the Pueblo East Pit, is clean and inert as defined in Rule 1.1. (20). <br /> Rule: 1.2.(2), states clean and inert material is any material which is, "...non-water— <br /> soluble and non-putrescible solids together with such minor amounts and types of other <br /> materials, unless such materials are acid or toxic producing, as will not significantly affect <br /> the inert nature of such solids. The term includes, but is not limited to, earth, sand, gravel, <br /> rock, concrete which has been in a hardened state for at least sixty days, masonry, asphalt <br /> paving fragments, and other inert solids." <br /> Date: , <br /> Signature <br /> The material delivered to the Pueblo East Pit was placed at the following GPS coordinates <br /> (midpoint of disposal location,) at an elevation of feet, MSL. <br /> Northing: <br /> Eastin : <br /> Nature of the delivered material: <br /> Approximate Cubic Yards of delivered material: <br /> Note for Field Foreman: <br /> This document shall be retained on-site. In addition, an electronic copy shall be sent to the <br /> Transit Mix Concrete Company's, Permit Specialist. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.