Laserfiche WebLink
Placement of the imported above listed waste materials into the pit and other areas <br /> now receiving processing fines will, at a minimum, raise the final topography to at <br /> least two feet above the prevailing ground water elevation. <br /> The above listed imported waste materials and the processing facility waste fines will <br /> be graded in conformance with the already approved reclamation plan. Aged <br /> concrete waste rubble will be backfilled and worked to eliminate voids. Therefore, <br /> since all imported waste material will be used to backfill mined out pits and other <br /> such areas, it is unlikely any stability issues shall occur. <br /> Respectfully, <br /> Mr. Brandon Heser <br /> Production Manager <br /> Transit Mix Concrete Co. <br /> 3 <br />