Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil depth is 0-6inches. We will attempt to stockpile the topsoil <br /> for eclamation, but it is hard to scrape such a thin layer and <br /> segregate N Mom a un er ying sK san an c <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Bottom of the hole to 20 feet bellow surface will be filled with <br /> bentonite. The top 20 feet will be cemented. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed(refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> All cutting pits will be refilled with excavated materials, once <br /> standing water is gone. Leveled drillsite will be re-contoured to as <br /> close as possible to the orginal topography. <br /> Form 2—Public File Page 9 of 14 <br />