Laserfiche WebLink
SJM GRM cme <br /> M-1973-007SG TRO6 Continental Materials Corporation <br /> J Annual Fee/Report: CW RECEIVED 440 S. LaSalle St. Suite 3100 <br /> J Vlolations: <br /> MV-2011-024 7/26/2012 -AB 7/23/2012 Chicago IL 60605 <br /> SEP 2 5 2011 <br /> DMSION OF RECLAMATION <br /> COLOKADO DIVISIOv OF �-V1G ND.SAFETY <br /> 1313 Sherman Sheet Room 215,Dearer,colmado Eo m pw43)a 3-347 <br /> REQUEST FOR TECH,71C'.0 REVISION(TR)COVER SHEET <br /> File No.:bt_ 1973-007SG Site Name:Daniels Sand Pit #2 <br /> Counts El Paso TR# (DR11S Use onhd <br /> Permittee:Continental Materials Corporation <br /> Operator(If Other than Permittee):Transit Mix Concrete Co. <br /> Permittee Representative:Mr.Brandon Heser, Transit Mix Concrete Co.(719)313-0316 <br /> Please provide a brief description of the proposed recision: A request to seed C)nicl Guard sterile seed as <br /> cover crop intended to protect the new wash fines berm slopes while the perennial seeded species <br /> become established. <br /> As defined by the Minerals Rules,a Technical Retzsion(IR)is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or propo sed Reclamation or <br /> Environmental Protection Plan." The Division is charged uvith determining if the re-�ision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered'-filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee uvith your request to <br /> expedite the revew process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable vithin 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that%%ill need to be addressed_ If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing.to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however.it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technica1Retision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a TechnicaMevuion. <br /> Permit Tcae Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials,and 112 quarries S216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l,2 or 3) S1006 ❑ <br /> .S <br />