My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-25_INSPECTION - C1992081
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1992081
>
2017-09-25_INSPECTION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:58:21 AM
Creation date
9/25/2017 8:59:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Date
9/25/2017
Doc Name
Inspection Report
From
DRMS
To
Hayden Gulch Terminal, LLC
Inspection Date
9/18/2017
Email Name
JDM
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 18,2017 C-1992-081/Hayden Gulch Loadout JDM <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R -Roads <br /> R -Availability of Records Y -Reclamation Success <br /> Y -Backfill&Grading Y -Revegetation <br /> NA -Excess Spoil and Dev. Waste NA - Subsidence <br /> NA -Explosives NA - Slides and Other Damage <br /> Y -Fish&Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> NA -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This was a complete coal inspection of the Hayden Gulch Loadout conducted by Jason Musick of CDRMS. <br /> Miranda Cawcak of Peabody Energy accompanied the inspection. The loadout site was dry and the weather was <br /> clear at the time of the inspection. No activities were being conducted at the main facilities area or around the <br /> railway. No mantainence or reclamation activities of the main facilities area,the railway, or the Tie-Across Haul <br /> Road were on-going at the time of the inspection. Permit Renewal No. 5 is currently under review by the <br /> Division. No other permiting actions are ongoing. <br /> AVAILABILITY OF RECORDS []Rule 5.02.4(1): <br /> All records were located at the Foidel Creek Mine offices. See the DRMS Availability of Records attached. <br /> HYDROLOGIC BALANCE -Rule 4.05 Drainage Control 4.05.1, 4.05.2, 4.05.3;Siltation Structures 4.05.5, <br /> 4.05.6; Discharge Structures 4.05.7, 4.05.10;Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface Water Monitoring 4.05.13;Drainage ❑Acid and Toxic Materials 4.05.8; <br /> Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> The truck loop pond was holding a small amount of water with no discharge noted through the primary CMP <br /> spillway and the valve on the spillway was closed. The embankments were well vegetated and stable with no <br /> problems noted. The Rail Loop Pond was dry at the time of the inspection,with no evidence of recent discharge <br /> noted. Embankments were stable and well vegetated with no problems noted. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.