Laserfiche WebLink
AXOM <br /> Mr. Raymond Lazuk <br /> Climax Molybdenum Company <br /> September 14, 2017 <br /> Page 2 <br /> After inspecting the area, reviewing pipeline and dam construction drawings, and considering the <br /> location of the leak, it is our opinion that the Mayflower seepwater pipeline leak identified has no <br /> impacts on 5 Dam stability, either currently or for the foreseeable future. The leak is located a <br /> significant distance from the current crest, not located within the structural dam shell and is close to <br /> the decant pond with the seep water flowing towards the decant pond water. AECOM will continue to <br /> work with the Climax team to monitor this leak as part of the regular review of the TSF's performance <br /> and will advise Climax if and when it should abandon the portion of line where the leak is occurring. <br /> AECOM represents that our services are performed within the limits prescribed by the Client in a <br /> manner consistent with the level and skill ordinarily exercised by other consultants under similar <br /> circumstances. No representation to the Client, expressed or implied, and no other warranty or <br /> guarantee is included or intended. <br /> Closing <br /> Please do not hesitate to call us with any questions or comments. <br /> Sincerely, <br /> JL;- <br /> .QiM� <br /> Lisa R. Yenne, PE Richard R. Davidson, PE <br /> Project Manager Senior Principal Engineer <br /> M\DCS\PROJECTS\WTR\60535541_CLX_GEN17\300-COMMUNICATIONS\310-CLIENT\MAYFLOWER SEEPWATER RETURN 09-14-17 DOCX <br />