Laserfiche WebLink
F <br />E <br />N <br />r <br />w <br />W <br />U) <br />0 C <br />z <br />❑ <br />Z <br />r� <br />0 <br />z <br />rn� _ <br />V <br />r <br />Q <br />r <br />U <br />z <br />U <br />W <br />z B <br />0 <br />U) <br />W <br />U) <br />W <br />J <br />U_ <br />W <br />W <br />2 <br />n <br />U <br />v <br />LO <br />r <br />Q7 <br />C3 <br />N <br />co <br />M <br />r <br />rn <br />C) <br />`y A <br />a <br />r` <br />r� <br />0 <br />N <br />N <br />00 <br />1 <br />2 <br />3 1 4 <br />AAA-rr"Ul LAIC cr-l= C1_117f=T r_ -end <br />5 <br />0 <br />MAI LUHLIIVt 7tC OhCC 1 %-,-1 U I <br />7 <br />KEYPLAN <br />CONSTRUCTION NOTES: <br />1. COUNTOURS REPRESENT <br />FINISHED GRADE. FOR CUT -FILL <br />ELEVATIONS TO SUBGRADE, SEE <br />CUT -FILL MAP. <br />2. ALL AREA WITHIN LIMITS OF <br />DISTURBANCE TO TOP OF SLOPE <br />TO BE GRADED TO FINISH GRADE <br />WHICH INCLUDES 6 INCHES OF <br />TOPSOIL. <br />3. PRE EXISTING TOPO BY INTRA <br />SEARCH 2009. <br />4. DATUM HORIZONTAL; MODIFIED <br />STATE PLANE VERTICAL NGVD 29. <br />5. EXCESS CUT TO BE PLACED IN <br />RECLAIMED POND PER DIRECTION <br />OF MARTIN MARIETTA. <br />6, EXISTING ROAD NOT TO RECEIVE <br />TOPSOIL_ <br />7. PRE -MINING CONTOURS ARE <br />SHOWN IN THE EXCESS CUT AREA. <br />r <br />J <br />A <br />A <br />Z <br />7) <br />A <br />JJ <br />J) <br />w <br />Z <br />J <br />Z <br />U <br />Q <br />0 15' 30' 60' <br />SCALE: 1" = 30' <br />M-2011-001 TRO1 <br />UJ <br />z <br />z <br />0 <br />U) <br />UJ <br />Project No.: <br />E IW <br />or rn <br />� <br />Designed By: <br />BT <br />W 0 <br />i— N <br />W <br />V <br />Checked By: <br />JB <br />Waw <br />m <br />W <br />C-1 <br />0 <br />0 <br />0 <br />U <br />_LL_ <br />F- N <br />Lu <br />H <br />Q) 004 <br />Z 2 <br />04 <br />U)z� <br />W <br />�zr- <br />� _J M <br />M <br />0 `. <br />(D Ltl <br />Q z <br />aJ ❑ <br />r = <br />a <br />UJ <br />z <br />z <br />0 <br />U) <br />UJ <br />Project No.: <br />133-24097-15901 <br />Designed By: <br />BT <br />Drawn By: <br />BT <br />Checked By: <br />JB <br />m <br />C-1 <br />0 <br />0 <br />0 <br />U <br />Bar Measures 1 inch <br />RECEIVE® <br />SEP 01 2017 <br />DIVISION OF RECURATIOIJ <br />MINING AND S,FETy <br />