My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-18_PERMIT FILE - P2017015
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2017015
>
2017-09-18_PERMIT FILE - P2017015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/1/2021 4:42:07 PM
Creation date
9/19/2017 2:02:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2017015
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2017
Doc Name
Application
From
J&J Collecting
To
DRMS
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings, ponds, etc. <br /> There will be no new construction. All mechanized equipment will be "walked in"from nearby 4wd <br /> forest service roads. The first area of disturbance, Site 001, is staked on the ground as a <br /> rectangular area of approximately 140 X 100 feet, which will include enough area for the tailings <br /> and storage of topsoil. The actual excavation on Site 001 will be smaller, approximately 60 X 80 <br /> feet(or 4800 square feet). Site 002 is staked on the ground as a rectangular area of approximately <br /> 220 X 120 feet, which will include enough area for the tailings, topsoil and a few test holes. The <br /> actual excavation will be smaller, approximately 80 X 120 feet(or 9600 square feet). <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity N/A Width (ft) N/A Length (ft) N/A <br /> B. Drill Holes: <br /> Diameter <br /> Quantity N/A Depth (ft) N/A (in) N/A <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity N/A Width (ft) N/A Length (ft) N/A Depth (ft) N/A <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> None <br /> Form 2—Public File Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.