My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-15_PERMIT FILE - M2017046
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017046
>
2017-09-15_PERMIT FILE - M2017046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 1:36:14 PM
Creation date
9/18/2017 9:47:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017046
IBM Index Class Name
PERMIT FILE
Doc Date
9/15/2017
Doc Name Note
new application
Doc Name
Application
From
Gary W. Pollack
To
DRMS
Email Name
ERR
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for construction, <br /> operations, and project closure. Include such items as the removal of structures and facilities including bridges and culverts, a <br /> revegetation plan,permanent containment of mine tailings,waste,or sludges winch pose a threat of a release into the environment, <br /> closing ponds and ebmnnating standing water,a final surface shaping plan, and post operations monitoring and maintenance plans. <br /> ANMc4L g GA,,rtq 7"r0/4/ ton LI- CONS 157 of 13, eK,FiaGiAl - of e9/oittwi/ <br /> 0,s e4 gt Daus fo/ ...r4A .s•1f AL0.4.. *V GOA/4%4 L-"Cd.irow-Lip* 140A..5 <br /> f,AsV#S. 014yafro cAv4-77 4,fa.�IS to ifrcA.{ awl IFXNd4147,0 of114 a.S <br /> 101/4am gr, eo.e.Ps,TAW Rot&'Irss Iry W/TN 7iVASIit4.64012 N471afiri44tito erg p. Am, <br /> esRev TiA/F- o A A ppciamgro 7P- .S'. i'M4L-Relci.4.0 7bN 4441 - ear,MONls rhAta3o <br /> ireR err g#437- A/Air Ard0A. <br /> sii 4 774 C#1O iA. 4/P C Cc CfAir3 ffeT-rQAll <br /> VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A. Required changes/modifications/special mitigation for plan of operations: <br /> 8. Bond. Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br /> Performance Bond No. , dated (mm/dd/yy) , signed by (Principal) and (Surety), for the <br /> penal sum of This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br /> conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br /> Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in connection <br /> with this operation. <br /> The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. The bond amount may be <br /> adjusted during the'term of this proposed plan of operations in response to changes in the operations or to changes in the economy. <br /> Both the Reclamation Performance Bond and the bond calculation worksheet are attached to and made pad of this plan of <br /> operations. Acceptable bond securities(subject to change)include: <br /> 1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle and interest in an amount <br /> equal at their par value to the penal sum of the bond;or <br /> 2. Certified or cashier's check,bank draft,Post Office money order, cash,assigned certificate of deposit, assigned savings <br /> account,blanket bond or an irrevocable letter of credit equal to the penal sum of the bond. <br /> Ili-more space is needed a,Jill out a block of information,use additional sheets and attach Jona*, <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.