Laserfiche WebLink
EXHIBIT E <br />RECLAMATION PLAN <br />Reclamation will be ongoing and will consist of grading the area to a slope of 3:1 <br />or less as areas in the pit have had all the usable sand and gravel mined. <br />Reclamation of the original Gaede pit area will begin first, and move southward <br />following the mining operations. Topsoil removed will be stored on site and used <br />for reclamation. If there is no natural growth from this topsoil, the areas will be <br />seeded with a fast growing cover, or a recommended seed mix from the NRCS. <br />Overburden will also be stored on site In stockpiles. The area will be reclaimed to <br />be productive rangeland. <br />EXHIBIT F <br />RECLAMATION PLAN MAP <br />