My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-10_PERMIT FILE - C1981010
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2017-08-10_PERMIT FILE - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 6:57:51 AM
Creation date
9/13/2017 6:49:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
8/10/2017
Doc Name
Annual Reclamation Report
Section_Exhibit Name
Appendix W 2016 Report Section 1.0 to 7.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mature Shrub Transplant Clumps <br />In 2016, no shrub clumps were constructed. Three new shrub clump is proposed for <br />construction in 2017. <br />Drainage Reconstruction <br />Refer to Section 3.0 of this annual report. <br />Contour Ditch Construction <br />During 2016, Trapper did not construct any contour ditches. <br />Stock Tank Construction <br />Two new Stock Tanks were constructed during the 2016 field season. Refer to Section 6. <br />Stock Tank Reclamation <br />No Stock Tanks were reclaimed during the 2016 field season. Refer to Section 6. <br />Developmental Drill Sites <br />During the 2016 Developmental Drilling season twelve holes were drilled within the permit <br />boundary in the I and L pit areas. All applicable developmental drill holes were abandoned per <br />permit section 3.3.2 and will be reclaimed and seeded per section 3.6.3.5 of the permit. Drill <br />hole abandonment typically uses Alternative 2 for sealing of the borehole. <br />Topsoil Piles <br />Topsoil taken from piles Al -09, AET-1, ZTS-4, Z2-07 and G1-02 was used as follows. Portions <br />of topsoil from G1-02 was used for reclamation in the areas of Z -AB -16, K -A-16 and also <br />stockpiled for later use due to pit advancement into K2-15 pile. Topsoil from AET-1 pile was <br />used for laydown in A -B-16 and Z -AB -16 reclamation areas. Topsoil from Al -09, AET-1 and <br />ZTS-4 was used in reclaiming the Z -AB -16 area. Refer to Section 5. <br />Sediment Dams <br />Pond cleaning during 2016, Middle Flume #1. <br />1.2.6 Previously Revegetated Acres <br />The locations and acres for all previously revegetated areas, seeded to perennial species, are <br />presented in Map(s) 1. To date, Trapper has revegetated approximately 4,172.3 acres <br />including the 143.7 acres in 2016 within the boundaries of active mining and has revegetated an <br />additional 516.0 acres within the permit boundary but outside active mining areas or topsoil <br />stripping limits. Of the total revegetated acres 3,690.8 reclaimed acres have received final <br />phase III bond release. Total life of reclamation is 4,688.3 acres. <br />Not shown on Map(s) 1 in this annual report are the areas seeded to temporary perennial mixes <br />that will require final reclamation prior to the end of the project (life of mine). <br />1.2.7 Re -Disturbed Reclamation Acres <br />The parcel identification and acres re -disturbed due to mining activities for all previously <br />revegetated areas will be documented here. Table 1.2 will show acres re -disturbed and <br />summarize the bond release status of each parcel. No previously reclaimed acres were re - <br />disturbed in 2016. <br />FVUBDN/GCR 2/17 <br />[DRMS\16RECtext1-0] <br />
The URL can be used to link to this page
Your browser does not support the video tag.