Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2016 <br />Trapper Mine <br />Mine name <br />Address: PO Box 187, Craig, CO 81626 <br />C-1981-010 <br />Permit # <br />Trapper Mining Inc <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This <br />This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed <br />2,889.4 <br />+ <br />48.8 <br />= <br />2,938.2 <br />Acres backfilled and graded <br />853.8 <br />+ <br />143.7 <br />= <br />997.5 <br />Acres to soiled <br />1 853.8 <br />+ <br />143.7 <br />=1 <br />997.5 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each cateaory below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 6,629.1 and the total number of acres: <br />Phase I released 4,372.3 Phase II released 4,000.1 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed n/a <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 599.3 <br />Acreage in active mining areas 3 1,341.4 <br />i(exclude acres where Phase III release has been achieved) <br />Phase III released 3,690.8 <br />2Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector <br />ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, <br />repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and graded areas <br />of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; and noncoal <br />waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded. <br />Last Years <br />This <br />Greater <br />Cumulative <br />Calendar <br />Cumulative <br />10 years <br />than 10 <br />Total <br />year <br />Total i <br />or less <br />years 1 <br />Acres seeded* <br />853.8 + <br />143.7 <br />= 997.5 <br />= <br />819.7 <br />+ <br />177.8 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 6,629.1 and the total number of acres: <br />Phase I released 4,372.3 Phase II released 4,000.1 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed n/a <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 599.3 <br />Acreage in active mining areas 3 1,341.4 <br />i(exclude acres where Phase III release has been achieved) <br />Phase III released 3,690.8 <br />2Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector <br />ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, <br />repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and graded areas <br />of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; and noncoal <br />waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded. <br />