Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br />the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br />stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2016, Trapper depleted topsoil piles Al -09, ZTS 4, Z2-07 and AET-1 for reclamation of parcels <br />Z -AB -16, K -A-16 and A -B-16. In preparation of pit advancement a portion of topsoil from G1-02 was <br />placed in two piles, 9MZ-3 and K2-15 for later use. <br />At the end of 2016, excluding stockpiles abandoned with the approvals of MR -155 and TR -94, there are <br />55 existing topsoil stockpiles at Trapper affecting 134.9 acres and storing approximately 2,903,628 cubic <br />yards of salvaged topsoil. <br />Presently there are no proposed approximate locations for new topsoil stockpiles in 2017. Trapper is <br />planning to utilize existing topsoil stockpiles and live haul stripping for the 2017 reclamation season. <br />GCR/BDN 2/17 <br />[Annual ReporADRMSI6RPT\16TStext5-0] <br />