<br />Final East Pit Ditch. <br />GENERAL MINE PLAN COMPLIANCE: <br />Cultural resource sites were inspected. Each site was clearly marked to for a 100’ buffer zone. No issues were <br />observed. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The Collom Haul Road activities has reached up to the Collom Facility area. Topsoil stripping, grading and rock <br />blasting were the primary activities during the inspection for the haul road. No issues were observed. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />The Collom Facility area pad was being constructed. Fill material was being placed along the area to create the <br />facility area footprint. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Pr otection 4.06.3; Redistribution 4.06.4: <br />Topsoil stripping along the Collom Haul Road continues. All piles being constructed were clearly marked. Each <br />pile has a collection ditch and sump for any erosion that may occur.