Laserfiche WebLink
1 N <br /> 1 <br /> ` G <br /> s <br /> , <br /> , <br /> , <br /> , <br /> i I 1 <br /> I <br /> r <br /> i <br /> RECEIVED <br /> In <br /> SEP 0 8 2017 <br /> DIVISION OF RECLAMATION — —` <br /> MINING AND SAFETY ` <br /> Growth media stockpiles were fertilized, seeded, and stabilized with jute netting. ZZCGIMMx <br /> The Interim Reclamation areas are still in progress. <br /> ® Pit Disturbance Boundary ��.J Property Boundary Sandstone Quarry 2017 DRMS Report <br /> - Interim Reclamation in Progress (Topsoil) L Permitted Affected Area Permit#M-1977-361 <br /> - Interim Reclamation in Progress (Backfill) - — — Canal/Ditch Map 1: Disturbance& Reclamation Areas <br /> - Growth Media Stockpile Prepared By: Drawn By: RFB <br /> Checked By: RFB <br /> 0 0.05 0.1 0.2 Miles Habitat Management Approved By: MLW <br /> www.habitatmanagementinc.com Date: 8/31/2017 <br />