My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-08_REPORT - M1977308
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977308
>
2017-09-08_REPORT - M1977308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 10:37:21 AM
Creation date
9/11/2017 1:15:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977308
IBM Index Class Name
REPORT
Doc Date
9/8/2017
Doc Name
Annual Fee/Report/Map
From
CEMEX, Inc.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 386,;t seeded w/ 34P w/topsoil 3togl mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil 7y„g Mulch application <br /> graded: 3(/44.9 fertilized w/ 3lry.9 replacement rate(tons/ac): o? <br /> a vd fertilizer: depth(in.): <br /> Seed DA\j (lq-W.Z4 Fertilizer Mulch or <br /> application OBr"Z.AKI application r&DALa,cA,4 application <br /> method: odS-zed method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br /> If"YES", indicate the weed species,control area,controi type,application rate and treatment date on the report map. <br /> See- 4*c -6 we-& repbr*w;4, " <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? ES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office ofMthState <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ®E NO N/A <br /> 19. Is your basis for legal right to enter still valid? ® NO <br /> 20. Does your permit require you to submit monitoring information annually? NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report <br /> 00ari'my we ve `e f>rk's are Sab-.r,04�, <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.