Laserfiche WebLink
August 29, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 6 of 7 <br /> <br /> Photo 3 : The minor rills o n the face of Gob Pile 2. <br /> <br /> Photo 4: Gob Pile 3, the area in the blue circle is the work being conducted on the west drying area. The red circle <br />indicates the area of pile 3 that has large rills forming on it, also shown in Photo 5.