My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-06_REVISION - P2016019
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2016019
>
2017-09-06_REVISION - P2016019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:13 AM
Creation date
9/6/2017 1:35:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016019
IBM Index Class Name
Revision
Doc Date
9/6/2017
Doc Name
NOI Form 2 Public File
From
Viscount Colorado Holdings, LTD
To
DRMS
Type & Sequence
MD1
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. MAPS & DRAWINGS <br />An accurate topographic base map showing the location of the proposed project must be <br />submitted with this notice. The prospector may submit a U.S.G.S. 7.5 minute quadrangle, or <br />similar map of adequate scale that: <br />1. Identifies the proposed prospecting site(s) or activity areas involving surface <br />disturbance. Activity areas include all drill holes, mud pits, excavations, trenches, adits, <br />shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. Includes sufficient detail to identify and locate known prospecting features and facilities <br />that may be affected and those that are not anticipated to be affected. This includes the <br />location of all drill holes, mud pits, excavations, trenches, adits, shafts, tunnels, rock <br />dumps, stockpiles, impoundments and prospecting roads. Color photographs, <br />adequately labeled (including date, orientation and location), of the prospecting site may <br />be used to fulfill this requirement if included with the NOI submittal. <br />III. PROJECT DESCRIPTION <br />1. Mineral(s) and/or <br />Resource(s) being Silver <br />Investigated: <br />2. Estimated dates of commencement and Commencement: 09/25 completion: /2017 <br />Completion 11 /30/ 2017 <br />3. Amount of material (specify units) to be <br />extracted, moved or proposed to be <br />moved: 1.5 Units Tons <br />Identify the type or method of prospecting proposed and quantity (place an "X") <br />❑ Cuts ❑ Pits ❑ Trenches <br />❑ Shafts ❑ Tunnels ❑ Adits <br />❑ Declines IN Air Drilling ❑ Fluid Drilling <br />❑ Drilling and Blasting <br />Form 2 — Public File Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.