My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-01_REVISION - M2007044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007044
>
2017-09-01_REVISION - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:00:55 PM
Creation date
9/5/2017 3:01:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Revision
Doc Date
9/1/2017
Doc Name
Notice for Second Period and Request for 2nd Hearing
From
Energy Fuels
To
DRMS
Email Name
SJM
GRM
AJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLOMDO <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 rDIViS <br /> O L O R A D O <br /> Phone:(303)866-3567 LON OF <br /> FAX:(303)832-8106 RECLAMATION <br /> MINING <br /> SAFETY <br /> Bill Ritter,Jr. <br /> February 7, 2008 Governor <br /> Harris D.Sherman <br /> Frank Filas Executive Director <br /> Ronald W.Cattany <br /> Energy Fuels Resources Division Director <br /> 44 Union Blvd., Suite 600 Natural Resource Trustee <br /> Lakewood, CO 80228 <br /> Re: Whirlwind Mine Application,M-2007-044,Initial Reclamation Liability Estimate. <br /> Dear Mr. Filas, <br /> The Division of Reclamation Mining and Safety(DRMS)has calculated the"Initial Reclamation Liability <br /> Estimate"for the proposed Whirl Wind Mine. The calculations are based on information supplied within the <br /> permit application, adequacy review and discussions with DRMS staff over specific issues. The estimate is <br /> divided into 4 sections. The costs for the Packrat Portal, Whirlwind Portal, Bulk head constructions, and satellite <br /> vent and power pads. <br /> A major difference between the original Exhibit L estimate and the current one is the costs of bulkhead <br /> construction. DRMS staff and Energy Fuels consultant Greg Lewicki worked extensively on this issue. The <br /> agreed upon bulkhead estimate of$226,706.00 is included along with surface reclamation estimates of <br /> $148,372.00. The total estimated reclamation liability is$375,078.00. Please review the surface reclamation <br /> bond estimate carefully. If there are any issues that need clarification or correction please contact staff as soon as <br /> possible. After review, if Energy Fuels accepts the estimate please submit written acceptance. Agreement on the <br /> Reclamation Financial Warranty must be completed prior to any decision recommendation. <br /> Please note that the BLM has been sent a copy of the estimate. By Memo of Understanding,BLM must concur <br /> on the estimate. If they have any issues they must be addressed. <br /> If you need additional information,please contact me at the Division of Reclamation, Mining and Safety,Grand <br /> Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction,Colorado 81501,telephone no. 970.241.1117. <br /> Sincerely, <br /> y� <br /> G. Russell Means <br /> Environmental Protection Specialist <br /> Cc: Carl Mount, Senior Environmental Protection Specialist,North Team Supervisor <br /> Allen Sorenson, DRMS Engineer <br /> Greg Lewicki, Lewicki and Associates <br /> Scott Gerwe,BLM Grand Junction Field Office <br /> RECEIVED FEB 112008 <br /> Office of <br />
The URL can be used to link to this page
Your browser does not support the video tag.