My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-31_REPORT - M1981185
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981185
>
2017-08-31_REPORT - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 9:34:14 AM
Creation date
9/1/2017 3:02:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REPORT
Doc Date
8/31/2017
Doc Name
Annual Fee/Report/Map
From
Sunrise Mining LLC
To
DRMS
Annual Report Year
2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunrise Mining, LLC <br /> May Day Idaho Mine Complex <br /> Permit M-1981-185 <br /> Annual Report Responses, 08/31/2017 <br /> d. Total acres mulched w/approved mulch: N/A. <br /> e. Total acres graded: N/A. <br /> f. Total acres fertilized w/approved fertilizer: N/A. <br /> g. Topsoil replacement depth (in.): N/A. <br /> h. Mulch application rate (tons): N/A. <br /> i. Seed application method: N/A. <br /> j. Fertilizer application method: N/A. <br /> k. Mulch application method: N/A. <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? Yes. <br /> a. Weed species: Canada thistle. <br /> b. Control area: May Day No. 1, May Day No. 2, Idaho, access road to Chief, Base of <br /> Operations. <br /> c. Control type: Spray. <br /> d. Application rate: Manufacturer's specifications. <br /> e. Treatment date: July 13—16, 2017. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? No. <br /> a. The main limiting factor for topsoil recovery is the presence of rock fragments. <br /> 15. Is reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? N/A. <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan <br /> and Office of the State Engineer(Well Permit, S.W.S.P.,and/or Permeant Augmentation <br /> Plan)? N/A. <br /> a. No mining activities may occur pending approval of M-1981-185, 112d-2 Amendment, <br /> AM-2. <br /> 17. Are all hazardous materials stored within approved spill containment structures? N/A. <br /> a. No hazardous materials are currently stored onsite. <br /> 18. Is your financial warranty sufficient to cover the cost to complete reclamation? Yes. <br /> 19. Is your basis for legal right to enter still valid? Yes. <br /> 20. Does your permit required you to submit monitoring results to this Annual Report? Yes. See <br /> attached. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act <br /> for the Extraction of Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to <br /> this report that accurately depicts the permit boundary,current affected boundary,and <br /> location of the acreages specified in items 7—12 and 14. See attached. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.