Laserfiche WebLink
�$ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> *„1876 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 G� <br /> rev v <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> FileNo.: M- 1980205 Site Name:Select Materials o�OFIR <br /> Weld WOW <br /> County TR# (DRMS Use only <br /> Permittee:Leister Materials Limited DBA Select Materials <br /> Operator(If Other than Permittee): M-1980-205 <br /> Michael Leister T601 <br /> C6Permittee Representative: �Cp PLIED! <br /> ,✓p Violations <br /> Please provide a brief description of the proposed revision: ECS, WHE <br /> This revision is to describe how we will be mining a smaller 5 acre plot at any one time and <br /> performing continual reclamation as the mining window moves. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 11 Oc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> I I Od, 112d(1, 2 or 3) $1006 ❑ <br />