My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-31_PERMIT FILE - M2017035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017035
>
2017-08-31_PERMIT FILE - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 9:34:41 AM
Creation date
9/1/2017 3:01:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
PERMIT FILE
Doc Date
8/31/2017
Doc Name
Addendum To Application
From
Miners Mall, LLC
To
DRMS
Email Name
SJM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: Oct. 2017 and completion: Sept. 2022 <br /> 2) How many years is the mine anticipated to be operational: five years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> ([3)all-yearlong or( ✓D seasonally,explain: subject to winter closure based on snowfall <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.10 acres <br /> 5) Depth of topsoil to be salvaged(only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> Other: <br /> _&L N/A, explain: Current soil is a mix due to previous mining-Will be sorting all soil & rock <br /> 6) Will you need to move any overburden (check one): (_2)Yes or(]::L)No <br /> a. If yes,approximately how thick is the overburden? 2 to 5 feet <br /> 7) How will the mine be accessed: (.a) existing roads (]a new roads will be created <br /> Please describe the existing roads: <br /> the mine. <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> None <br /> 8) Will water be needed during the mining operation (check one): (1])Yes or(-0)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (-ZJ Yes or(-DJ No <br /> a. If yes, please describe the water diversions or impoundments: <br /> Will be using weed-free straw bales to prevent topsoil loss at cliff edge and around topsoil pile <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or(-Z)No <br /> a. If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.