My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-31_REPORT - M2012014
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2012014
>
2017-08-31_REPORT - M2012014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 9:34:18 AM
Creation date
9/1/2017 9:30:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012014
IBM Index Class Name
REPORT
Doc Date
8/31/2017
Doc Name
Annual Fee/Report/Map
From
Dietzler Construction Corporation
To
DRMS
Annual Report Year
2016
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i Page 3 of 5 <br /> 112c Annual Report t <br /> 4 <br /> Permit Number: , M-2012-01 <br /> Permittee Name: Dietzler Coi struction Corporation <br /> RECEIVEDOperation Name Pawnee A egate Pit <br /> Counh \Veld <br /> _ f I <br /> AUG 3 2011 Anniversary Date: June 20,2OJ7 <br /> DIVISION OF RECLAMATION, Current Bond Amt: 1 $191,000.0 <br /> MI PS Annual Fee Due: $701.00 <br /> Permit Acreage: I 60.00 <br /> L (DRMS Office Use Only) ARMS Specialist " DEC _ <br /> s <br /> t <br /> According to C.R.S. 34-32.5-1 16 or 34-32-1 16. each year. on the anniversar\ dateofthepirmit. an operator shall submit <br /> the /\nnual Fee,an Annual Report and Map%hoa ing the extent ofcurrent disturbance~to aft ted land.required monitori•lc <br /> information. reclamation accomplished to date and during the preceding dear. am ne%% di. urbance that ie anticipated to <br /> occur during the upcoming year, am reclamation that %%ill be performed during the u mini year. the dates for tie <br /> beginnim ofactive operations.and the date acti\c operations ceased for the year. <br /> 1 <br /> Information contained in this report will tx revic%%ed by the Division upon receipt and{prior to the next compliance <br /> inspection of the site. If, while completing this report. you learn that your site is not in cosy pliancc with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action; <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? YES NO <br /> `i <br /> 2. is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? 8 YF NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation. Rule 3.1.3. i <br /> 4. What was the date of last excavation, processing or hauling activity at the mine'? Ju 2 o J <br /> t <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 1 <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status! } YES 146 <br /> b)approval for INTERMITTENT OPERATION? $ YES <br /> i <br /> 7. Number of acres currently affected(mining+ incomplete and or unreleased reclamatio ): 51 �( J^+> <br /> E. Number of acres that were newly affected during the current report year: O A re <br /> S <br /> i <br /> 9. Number of acres that were reclaimed during the current report year: U f�✓ts <br /> 10. Estimated new acreage to be affected in the next report year: &re s <br /> 11. Estimated acres to be reclaimed in the next report year: <br /> 2 Ac-re> <br /> d <br /> { <br /> [6 <br /> I <br /> I <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.