Laserfiche WebLink
Monument Dam <br />Inspection Form <br />Date: j ;I& L17 <br />Time: <br />Name of Inspector:�e. <br />Current Panel Being Mined: E <br />❑ Weekly Inspection "onthly Inspection <br />Yes No <br />❑ ue" Is mining within 1 mile of Monument Dam? <br />Are there visible surface cracks on the dam? <br />If yes, indicate length and size of crack. <br />Is there evidence of subsided areas on or around the dam? <br />If yes, indicate where and degree. <br />p Are there bulges on the dam? <br />If yes, indicate where and degree. <br />❑ W-1 <br />70011MR21 <br />Are there signs of seeps on the dam? <br />If yes, indicate where and estimated flow. <br />Are there any other potentially damaging features on the dam? <br />If yes, describe. <br />❑ F,� Are there any recent evidences of slope failure on the landside south of the <br />dam (perform visual inspection and data analysis of inclinometers)? <br />If yes, describe. <br />Notes: <br />Signature of Inspector: <br />Inspections are performed under the direction of Mike Peacock, P. E. <br />If cracks or other potentially damaging features occur, notify Mike Peacock or Kathy <br />Welt immediately. <br />(WAMCC-Engineering\ENV PERMITTING\REGAGENCIES\CDRMS\Monument Dam\Monument Dam Inspection Procedure\Monument Dam Inspection Form) <br />