Laserfiche WebLink
Monument Dam <br />Inspection Form <br />Date: 0 1 b <br />Time: <br />Name of Inspector:' <br />Current Panel Being Mined: A(a #G <br />LiWeekly Inspection monthly Inspection <br />Yes No <br />❑ Is mining within 1 mile of Monument Dam? <br />❑■ <br />11 <br />Are there visible surface cracks on the dam? <br />If yes, indicate length and size of crack. <br />Is there evidence of subsided areas on or around the dam? <br />If yes, indicate where and degree. <br />❑ Are there bulges on the dam? <br />If yes, indicate where and degree. <br />❑ C� Are there signs of seeps on the dam? <br />f If yes, indicate where and estimated flow. <br />❑1 Are there any other potentially damaging features on the dam? <br />} If yes, describe. <br />❑ d Are there any recent evidences of slope failure on the landside south of the <br />dam (perform visual inspection and data analysis of inclinometers)? <br />If yes, describe. <br />Notes: ] <br />Signature of Inspector: <br />Inspections are performed under the direction of Mike Peacock, P.E. <br />If cracks or other potentially damaging features occur, notify Mike Peacock or Kathy <br />Welt immediately. <br />(WAMCC-Engineering\ENV PERMITTING\REG AGENCIES\CDRMS\Monument Dam\Monument Dam Inspection Procedure\Monument Dem Inspection Form) <br />