Laserfiche WebLink
Spring 2017 Subsidence and Geologic Field Observations <br />South of Divide and Dry Fork Mining Areas <br />drilling rig was setting up on that location to begin the process of drilling and completing the MVB <br />E7-2 well. Areas further south were under construction (i.e., road cutting and pad preparation) <br />which precluded additional baseline observations. <br />831-032.799 Wright Water Engineers, Inc. Page 26 <br />August 2017 <br />