My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-21_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2017-08-21_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 9:18:33 AM
Creation date
8/29/2017 10:44:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
8/21/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
RN4
Email Name
CCW
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: C-1996-084 Permit Renewal No. 4 Reclamation Cost Estimate <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/16/2017 County: Las Animas Filename: C084-000 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Grade Borrow Area 3 GRADER 1 2.21 $297.00 <br />002 Replace Topsoil from Stockpile BA#1 to Fill 7a TRUCK1 1 4.84 $6,242.00 <br />003 Replace Topsoil from Stockpile SSP#2 to Fill 9a TRUCK1 1 7.31 $9,438.00 <br />004 Replace Topsoil from Stockpile SSP#3 to Fill 8 TRUCK1 1 13.00 $16,788.00 <br />005 Replace Topsoil from Stockpile SSP#2 to N-1 TRUCK1 1 8.17 $10,553.00 <br />006 Replace Topsoil from Stockpile BA#2 to C-1 TRUCK1 1 12.76 $16,473.00 <br />007 Replace Topsoil from Stockpile BA#1 to C-2 TRUCK1 1 7.86 $10,190.00 <br />008 Replace Topsoil from Stockpile BA#2 to S-2 TRUCK1 1 3.07 $3,873.00 <br />009 Replace Topsoil from Stockpile BA#3 t o S-4 TRUCK1 1 3.33 $5,057.00 <br />010 Replace Topsoil from Stockpile BA#32to W -2 TRUCK1 1 10.58 $16,066.00 <br />011 Replace Topsoil from Stockpile BA#3 to W -3 TRUCK1 1 2.98 $3,830.00 <br />012 Replace Topsoil from Stockpile BA#3 to W -5 TRUCK1 1 10.74 $16,301.00 <br />013 Replace Topsoil from SA Stockpile to Service <br />Area <br />DOZER 2 0.23 $115.00 <br />014 Replace Live -Handled Topsoil to W -1 DOZER 2 4.33 $2,085.00 <br />015 Replace Topsoil from Upslope to W -1 DOZER 2 4.32 $2,078.00 <br />016 Replace Live -Handled Topsoil to W -1 DOZER 2 1.72 $830.00 <br />017 ReplaceTopsoil from Upslope Area to W -4 DOZER 2 1.92 $922.00 <br />018 Replace Live -Handled Topsoil to W -6 DOZER 2 1.54 $743.00 <br />019 Replace Topsoil from Upslope Area to W -6 DOZER 2 0.86 $413.00 <br />020 Replace Topsoil from Stockpile BA#3 to W -6 TRUCK1 1 1.11 $1,690.00 <br />021 Replace Live -Handled Topsoil to N-2 DOZER 2 11.55 $5,717.00 <br />022 Replace Topsoil from Upslope Area to N-2 DOZER 2 12.84 $6,177.00 <br />023 Replace Live -Handled Topsoil to S-3 DOZER 2 0.98 $472.00 <br />024 Replace Topsoil from Upslope to S-3 DOZER 2 0.53 $254.00 <br />025 Replace Topsoil from Stockpile BA#3 to S-3 TRUCK1 1 0.67 $1,024.00 <br />026 Replace Topsoil from Stockpile SSP#2 to N-1 DOZER 2 4.16 $2,060.00 <br />027 Replace Live -Handled Topsoil to E-2 DOZER 2 0.83 $398.00 <br />028 Replace Topsoil from Upslope Area to E-2 DOZER 2 0.82 $397.00 <br />029 Replace Live -Handled Topsoil to E-3 DOZER 2 1.65 $794.00 <br />030 Replace Topsoil from Stockpile BA#3 to E-3 TRUCK1 1 1.27 $1,920.00 <br />031 Replace Topsoil from Upslope Area to BA#1 DOZER 2 1.45 $715.00 <br />032 Replace Topsoil from Upslope Area to BA#2 DOZER 2 1.73 $831.00 <br />033 Replace Topsoil from Upslope Area to BA#3 DOZER 2 3.88 $1,868.00 <br />034 Remove Topsoil from Knob Above Cut DOZER 2 25.07 $12,064.00 <br />040 Plug and Seal Drill Hole and Monitoring Wells BOREHOLE 1 27.00 $13,030.79 <br />050 Broadcast Seeding Mine Site REVEGE 1 126.00 $189,921.00 <br />051 Hydroseeding Steep Slopes at Mine Site REVEGE 1 16.00 $62,804.00 <br />052 Fertilize Mine Site During Year 2 REVEGE 1 84.00 $19,288.00
The URL can be used to link to this page
Your browser does not support the video tag.