My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_PERMIT FILE - C1982056A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2017-07-11_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 8:55:21 AM
Creation date
8/29/2017 8:44:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
7/11/2017
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twentymile Mine railroad spur. The 6RT Thickener Underflow Borehole extends approximately 540 feet from the surface <br />into the sealed EMD mine workings. An existing light -use road extends approximately 250 feet from RCR33 to this <br />location. The 7RT Thickener Underflow Borehole installation will be located east of both the intersection of Routt County <br />oads 27 (RCR27) and 33 (RCR33) and the 6RT Borehole, on the north side of Foidel Creek and the Twentymile Mine <br />ilroad spur. The 7RT Thickener Underflow Borehole will extend approximately 850 feet from the surface into the sealed <br />EMD mine workings. The 2MN Thickener Underflow Borehole installation will be located near the north edge of the <br />existing Mine Facilities Area, between the existing Weld Shop and the Twentymile Railroad Spur and will be accessed by a <br />short (550 feet) access road from the existing mine road. The 2MN Thickener Underflow Borehole will extend <br />approximately 150 feet from the surface into the existing active 2MN No. 6 Mine Entry. From this location, the coal slurry <br />will be piped underground approximately 2,650 feet and 3,850 feet, respectively, to horizontal boreholes into the sealed 7 - <br />Right and 8 -Right Panels in the Eastern Mining District (EMD). <br />An additional thickener underflow borehole will be added in the WMD in 2017. The 12 -Left Thickener Underflow Borehole <br />will be located off RCR27 just east of the intersection with County Road 37 on the north side of the road. The borehole will <br />extend into the WMD mine workings approximately 1,260 feet in the 12 -Left Irby Panel. <br />Three additional thickener underflow boreholes will be added in the SWMD in 2016 and 2017. The SWMD Thickener <br />Underflow Borehole will be located near the Fish Creek Borehole road where it joins RCR27. Two alternate borehole <br />locations have been identified, only one of which will be initially constructed and developed. The first location 1 (in Panel <br />2SW) is located on the west side of RCR27 between the west mine entrance and the Fish Creek Borehole road, and has been <br />selected for construction. The second location (in Panel 1 SW) is located on the east side of RCR27 and will be accessed <br />from the Fish Creek Borehole road this location was an alternative and will not be constructed at this time but may be a <br />potential site in the future. The SWMD Thickener Underflow Borehole in 2SW will extend from the surface into the sealed <br />SWMD mine workings a maximum of approximately 750 feet. TC also plans a test borehole (Sandstone Sub Test Borehole) <br />to evaluate conditions in the 3SW Gateroad (WMD) for a future thickener underflow borehole. The test hole will be located <br />on the existing Sandstone Substation pad, and will be directionally drilled to intersect the 3SW Gateroad at a depth of <br />approximately 420 -feet. If conditions in this area are favorable, TC will convert the test borehole to a thickener underflow <br />orehole, which will involve boring the test hole out to 22 to 24 inches for the surface casing and 12 to 15 inches for the <br />fished borehole, setting and cementing a 16 to 18 inch surface casing to a depth of approximately 60 feet, setting and <br />cementing a 8 to 11 inch borehole casing to a depth of approximately 420 feet, and setting an 8 -foot covered CMP <br />manhole with lightening protection in-place to protect the well -head. The third borehole will extend approximately 1,060 <br />feet into the 1 SW Panel, at a location north of the sandstone cliffs adjacent to the Twentymile Facilities in the SWMD. This <br />borehole will be accessedfrom the existing ranch road which is used to access the Union Cellular tower from the Fish Creek <br />Road. Minor road improvements to provide for year-round access will include limited grading, placement of water -bars <br />and minor work on the existing ditches, and placement of gravel surfacing materials. <br />In order for the thickener underflow to reach the 1 SW, 2SW, and the 12 -Left thickener underflow boreholes, a pump boost <br />station will be installed near the West Truck Scales at the west entrance to the Mine Facilities Area. The pump boost station <br />will consist of a one -foot thick, 20 x 20 foot concrete pad, a pre -fabricated pump building, the booster pump and piping <br />connections, and a drop -line from a nearby power -pole with electrical connections and pump controls. <br />At each of these locations (except the Sandstone Sub location, where a pad already exists), a drill -pad and required <br />drainage structures were or will be constructed. Buried thickener underflow pipelines have been or will be installed <br />between the existing washplant facilities and the thickener underflow boreholes. The locations of the thickener underflow <br />boreholes and the associated pipelines are shown on the Surface Facilities and Freshwater Systems Map, <br />Map 24 (1/4). Design information for the thickener underflow boreholes and pipelines is provided in Exhibits 49K and 495. <br />Installation of the thickener underflow boreholes generally involves placement of construction erosion controls (silt fence <br />and/or straw wattles), removal and windrowing of available soil materials from pad areas and the road margins, <br />construction of designed drainage structures (ditches and rock sumps), grading to establish level drill -pads and construct or <br />improve roads, placement of gravel as surfacing for the light -use road, excavation of temporary cuttings pits on the drill - <br />„ads, drilling and casing of the boreholes, and installation of protective access manholes. On completion of drilling and <br />sing operations, the cuttings pits are allowed to dry -out, material excavated from the pits is replaced and graded, and the <br />pad surface is graveled to control <br />TR17-88 2.05-84.6 06/10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.