My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_PERMIT FILE - C1982056A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2017-07-11_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 8:55:21 AM
Creation date
8/29/2017 8:44:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
7/11/2017
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond A Access Road <br />This road was formerly a portion of Haulroad C utilized by CYCC. As such, TCC contracted with Northwest <br />Colorado Consultants to evaluate the road for its continued use as an access road into Pond A. The evaluation <br />indicated that an additional 4 inches of Class VI base course and 6 inches of pit run gravel should be applied in lifts <br />and compacted as per the requirements of Rule 4.03.2 to make the road suitable for long-term use as an access road. <br />The location of the road is shown on Map 24A. <br />Rock Dust Tank. Scale. and FUM No.1 Access Roads <br />All of these are existing roads and are monitored to determine if additional surfacing material is needed to maintain <br />compliance with the applicable regulations. <br />Batch Weigh/Loadout Building Access Road <br />A new access road for construction and utilization of the Batch Weigh/Loadout building will be established east of <br />the Tipple 2 product pile site and north of the existing overland conveyor (see Map 24). The access road will be <br />designed and constructed in accordance with the design requirements of Rule 4.03.2. The access road will roughly <br />parallel the overland conveyor for a distance of approximately 390 feet east of the existing Tipple 2 loadout <br />stockpile and terminate at a point south of the location of the Batch Weigh/Loadout building. Following <br />construction, sediment control for the new access road area will be provided by the existing rock filters and <br />vegetative filers currently established for the area. <br />Approximately 1,500 cubic yards of excess fill will be generated from the excavation work required to establish the <br />access road. The material generated will be utilized as permanent fill in the relocation of County Road 27, as <br />TR12-80 2.05-73.1 11/07/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.