Laserfiche WebLink
RECEIVED frytIae2 d2-(7 <br /> AUG 28 2017 <br /> f Reclamation, STRUCTURE AGREEMENT <br /> t 1 ung&Safety <br /> This Structure Agreement is entered into between the ALSH, LLC, a Colorado <br /> limited liability company and Sooner Lucky Strike Mine Ltd., a Colorado corporation <br /> (collectively, "Owner") as the owners of the land and structures on or within two hundred <br /> (200) feet of a permitted mine site and Fossil Creek Mines, LLC, a Wyoming limited <br /> liability company("Operator"). The mine site is known as the Lucky Strike Mine and <br /> Mill, which operates under DRMS permit no. M-1982-020. <br /> The permitted area consists of 8.0 acres of patented claim land, which contains upon its <br /> surface numerous structures and improvements. The Owner of the permitted area owns <br /> all surface improvements on the permitted area, and the lands and structures within 200 <br /> feet of the permitted area. <br /> The significant surface improvements on the permitted area include: metal buildings <br /> containing milling facilities, diesel fuel and chemical storage, materials and supplies <br /> storage, a shaft to access the underground mine workings,metal headframe and hoist, <br /> mill containment facilities, tailings ponds, and lined mine dewatering pond. Structures <br /> on and within 200 feet of the permitted area include: dirt roads, fences, and earthen <br /> drainage conveyance structures. <br /> The Owner allows the Operator to access and utilize the site and its facilities according to <br /> approved plans in the DRMS reclamation permit, and as set forth in the current Right-of- <br /> Entry Agreement and current Access Agreement. Operator will do so at its own cost and <br /> expense and will make all necessary improvements at its own cost and expense. <br /> In the event of any damage to the structures arising out of or relating to the use of the site <br /> by Operator or its agents, Operator shall pay to Owner compensation for such damages. <br /> Notwithstanding the foregoing, however, the parties agree that given the current value of <br /> the structures and the various improvements to the site being made by Operator without <br /> charge to Owner, the maximum compensation that may be owed by Operator for damage <br /> or destruction of the structures shall not exceed $5,000. <br /> The Operator agrees to exercise reasonable care in the use and maintenance of the <br /> permitted land and faciilittiiess. <br /> Effective this day of August, 2017. <br /> SH, LLC, Colorado limited liability company <br /> By: <br /> Stephen Bagh adi, Chief Executive Officer <br /> Page 1 of 3 <br />