My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-28_REPORT - M2009004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2009004
>
2017-08-28_REPORT - M2009004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2017 9:40:08 AM
Creation date
8/29/2017 8:02:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009004
IBM Index Class Name
REPORT
Doc Date
8/28/2017
Doc Name
Annual Fee/Report/Map
From
Rocky Mountain Materials and Asphalt, Inc.
To
DRMS
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. 1 otal acres in \arious stages of reclamation. since permitted mining activities began. <br /> total acres 0.9 Total acres N/A Total acres N/A Total acres N/A <br /> backtilled: seeded w w-topsoil mulched w <br /> approved mix: _ replaced: approved mulch: <br /> Total acres 0.9 Total acres N/A Topsoil N/A Mulch application N/A <br /> graded. fertilized w replacement rate (tons ac): <br /> aped fertilizer: depth (in.): , <br /> Seed N/A E etilizer N/A Mulch N/A <br /> application • application application - <br /> method:: method: method: <br /> 13. Is weed control being conducted m accordance with an approved Weed Control Plan' YES NO N A <br /> If"YES", indicate the weed species, control area, control type. application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation. based on your approved permit? YES NO N A <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated,stabilized in accordance with Rule 3.1 9(1)? YES NO N A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater. is the site in compliance w ith the approved mining plan and Office of the State <br /> Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N"A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N'A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N'A <br /> 19. Is your basis for legal right to enter still valid'.' YI NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N A <br /> If"Yes", please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials (C.R.S. 34-32-116 or 34-32.5-116). attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: X <br />
The URL can be used to link to this page
Your browser does not support the video tag.