Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />White River Electric Assoication (WREA) will construct, operate, and maintain a 69 kV power line from <br />the Axial Basin substation adjacent to State Highway 13 to the Collom facitlies area. This power line will <br />be wholly owned by WREA. The ground disturbing activities associated with construction of the power <br />line, including pole locations and roads to pole locations, are not associated with Colwoyo's mining <br />activities, and will not be required to be bonded in accordance with Rule 3.02.1(2). The power line will <br />service the area post -mining in Collom. <br />Rule 4 Performance Standards 4.12-3 Revision Date: 6/16/17 <br />Revision No.: MR -176 <br />