My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_PERMIT FILE - C1981019A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2017-07-11_PERMIT FILE - C1981019A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:46:10 AM
Creation date
8/28/2017 7:51:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/11/2017
Section_Exhibit Name
Volume 20 Exhibit 27 Item 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 27, ITEM 3 <br />I. INTRODUCTION <br />The Collom In -Pit Drilling Program will consist of drilling 33 drill holes (Please see Figure Exh. <br />27-3-1 for drill pad locations) in order obtain data to enhance the Collom Geologic Model. <br />Planned drill holes will be drilled to approximately 20 feet below the GB seam, which is the <br />lower most seam in the Collom mining sequence. A small area exemption for sediment control <br />for all drill pads and drills roads is presented in Exhibit 7, Item 26 in Volume 18. <br />II. SEALING AND RECLAMATION OF DRILL HOLES, DRILL PADS, AND <br />DRILL ROADS <br />Drill pads shown on Figure Exh. 27-3-1 and listed on Table Exh. 27-1 will have either one single <br />rotary drill hole or a combination of a rotary and core drill hole on each pad. All drill holes will <br />be completely or partially mined through, and will be reclaimed in accordance with Section <br />2.05.4(1) in Volume 15. <br />Topsoil will be stripped or windrowed directly adjacent to all drill pads and drill pad roads. All <br />topsoil that is windrowed will be picked up during the larger stripping effort associated with <br />development of the Collom Pit. Drill pads and drill roads will also be mined through, or will be <br />within the larger disturbance footprint associated with the Collom Pit. All drill pad locations and <br />drill roads will be reclaimed at the appropriate time in accordance with Map 29B and Section <br />2.05.4 in Volume 15 when mining is complete. <br />Exhibit 23A 1 Revision Date: 6/22/17 <br />Revision No.: MR -174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.