Laserfiche WebLink
'^ Colorado Alabaster Supply CAS Quarry Reclamation Plan Map <br /> Permit#M-s9-on <br /> 22,Augfust 2017 <br /> lop <br /> 01 <br /> DE <br /> x <br /> ► � § y � ` M .. LL `tea s `__ ,�� <br /> y ei <br /> * `aj n. t` sy� �, rr*!�`Li .• � r �J. N� � •, gt. <br /> .w. <br /> A-Current&projected working area Vo <br /> B-Soil Stockpile ®� <br /> C-Waste Stockpile <br /> D-Dig Area V �\ <br /> E-Product Stockpile ``\\G 2Q�o '10* <br /> F-Direction in which mineral extraction will proceed Pv � .,.-. <br /> G-Permit Sign �QFR SPF <br /> H-Existing ranch road 10e05���aGP�� <br /> Reclamation Plan <br /> Each year after quarrying, we will smooth down areas that we no longer need for operation purposes into a gentle <br /> slope, in general these slopes will be 4:1 or less. In our operation we will backfill the deposit to protect it from cracking <br /> and weathering. These backfilled areas are steeper, approx. 3:1. We will then cover the area that is no longer needed <br /> with the stockpiled soil at 12"-14". Vegetation will be seeded according to the recommendation of the Soil <br /> Conservation Service as outlined in our original reclamation plan. <br /> 2010—Activity in the area within the area between "B, D, & E" <br /> 2011 —No activity due to weather and scheduling issues. <br /> 2012—Activity in the area within the area between "B, D, & E September 27tn and 29tn <br /> 2013—Activity in the area within the area between "B, D, & E" October 25tn and 26th. <br /> 2014—Activity in the area within the area between "B, D, & E" September 171n and 181n <br /> 2015 —Activity in the area within the area between "B, D, & E" September 251n and 261n. <br /> 2016—Activity in the area within the area between "B, D, & E" September 24th. <br /> 2017—Activity planned for late September, possibly early October, again in the same area as 2016 <br />