Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 026 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />(%) <br />(%) <br />(%) <br />(fpm) <br />Time <br />mm <br />1 <br />750.00 <br />min <br />1 <br />750.00 <br />5.00 <br />4.00 <br />9.00 <br />824 <br />0.946 <br />Haul Time: <br />Return Route: <br />0.946 <br />minutes <br />Seg # <br />Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />mm <br />1 <br />750.00 <br />-5.00 4.00 <br />-1.00 <br />3159 <br />0.297 <br />Return Time: 0.297 <br />Total Truck Cycle Time: 4.093 <br />Loading Tool unit <br />Production 476.31 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />226.92 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 376.69 <br />Adjusted single truck/loader team production: 376.69 <br />Adjusted multiple truck/loader team production: 376.69 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.404 /LCY <br />minutes <br />minutes <br />395.34 LCY/Hour <br />188.35 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 5.76 Hours <br />Total job cost: $3,044 <br />CIRCES Cost Estimating Software <br />