Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Remove and dispose of Rip rap from ditches, D1, D2, D3, D4 <br />Site: Colowyo Coal Mine Permit Action: 13C Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado <br />Date: 3/15/2017 County: Moffat <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />I0 juy <br />ipti <br />Abbreviation: None <br />Filename: C019-026 <br />Shift basis: 1 per day <br />Truck Loader Team -Truck: <br />-Loader: <br />Cat 725 <br />CAT 950H <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />Cat D9T - 9SU <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cast Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $528.98 <br />MATERIAL QUANTITIES <br />Initial volume: 2 168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-23B, Table 1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />50 <br />NA <br />NA <br />Ownership cost/hour: <br />$54.66 <br />$25.38 <br />NA <br />$100.59 <br />NA <br />NA <br />Operating cost/hour: <br />$38.75 <br />$28.79 <br />NA <br />$43.62 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$30.37 <br />$41.20 <br />NA <br />$41.85 <br />NA <br />NA <br />Unit Subtotals: <br />$123.78 <br />$95.37 <br />NA <br />$186.05 <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$342.93 <br />Support: <br />$186.05 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $528.98 <br />MATERIAL QUANTITIES <br />Initial volume: 2 168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-23B, Table 1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,300 <br />Pounds/LCY <br />Description: Decomposed rock - <br />75% Rock, 25% Earth <br />Rated Payload: 52,000 <br />Pounds <br />Payload Capacity: 15.76 <br />LCY <br />CIRCES Cost Estimating Software <br />