Laserfiche WebLink
le <br /> 31, <br /> f <br /> _j ------- <br /> J <br /> --A <br /> 21 1 <br /> 14 <br /> IV <br /> rl <br /> ............ <br /> V <br /> ? <br /> 00F/1 <br /> 3 <br /> ell <br /> 4 e <br /> f <br /> ----------- <br /> ..... . <br /> ..... . ... ..... .. <br /> 01 ..... . . <br /> 7--7 <br /> z <br /> 000001 <br /> /P, <br /> fl <br /> tl <br /> TOPS <br /> 2016 <br /> -- 2 ) <br /> roo-,� <br /> 4�' <br /> 4 <br /> '7 <br /> 2016' <br /> V <br /> 4 <br /> --1--------------------- <br /> J <br /> IP <br /> ..................... <br /> j <br /> f <br /> f <br /> /0 <br /> 771L <br /> V <br /> 000r, <br /> 2 <br /> /L <br /> V/ <br /> It 11 <br /> f <br /> V <br /> r <br /> V ...... <br /> V <br /> ......... <br /> ilk f <br /> LEGENDCoordinates in NAD27 Colorado North Zone,US Foot ED <br /> _,vl TopSo <br /> �� - ANISO <br /> Permit Boundary 26 25 30 29 28 ENGINEERS CERTIFICATION 12 vil IL HANDLING <br /> Topsoil Stockpile 32 33 34 35 36 31 32 33 34 35 36 31 32 33 /, LEE E SAPSON, hereby certify that this APR Collom Area <br /> 0 0 8 9 10 11 T5N map has begn reviewed by me and is true 7 8 10 11 12 7 8 9 T4N and correct to the best of my knowledge and Township, Range, and Section 17 16 15 14 13 information,relying on inform & SCALE. 500' <br /> 1 15 14 1::? 18 17 16 by experts employed by Colowyo Coal <br /> 20 21 22 Company or qualified consultants working DATE: 6128106 <br /> -gwFIESI <br /> Topsoil Strip Area 24 19 20 21 -2 24 19 20 21 for Colowyo Coal Company, and that I am a <br /> Topsoil Removal Boundary (PMT Tie In Boundary) E — DRWG.BY. —TCp <br /> 29 28 Professional Engineer licensed in Colorado as APPROVED BY. TAT <br /> COAL <br /> 26 25 30 29 28 5 required by the provisions of C.R.S.32 33 34 35 36 31 — 12-25-101 through C.R.S. 12-25-119. IN COMPANY DRWG NO. <br /> Topsoil Removal (By Year) 32 33 'L <br /> Sagebrush Steppe Target Area (Approx. 4 Replacement Depth) -T4N WITNESS WHEREOF, I have hereunder set R--PRODUCI 1 O'S'i�slov <br /> Other Areas will receive variable topsoil replacement depths as 5 4 3 1 6 5 4 T3N my hand and affixed my seal. Colowyo Coal Company MAP 28C <br /> Virgin Topsoil Removal to Stockpile described in Section 2.05.4 (2)(d) 8 9 5731 State Highway 13 Sheet 1 of 2 <br /> S10 11 1 8 9 10 1 12 7 8 9 Meeker,Colorado 81641 <br /> 17 <br /> IN L C <br /> 500' 0 500' 1 16 14 17 16' 15 4 13 18 17 16 <br /> Topsoil Replacement from Stockpile 1000 <br /> MO T 0. No. REVISION DATE BY CHK <br /> RIO LA CO C ;ro <br /> 20 21 22 23 24 1 20 21 P <br /> 9 20 21 <br /> 00 PR-04 Revised Topsoil Stripping Timing 215116 TONY JG <br /> CONTOUR INTERVAL 25 FT. <br /> U 27 26 25 30 29 28 47031 <br /> Roads Premine Topo <br /> Revised Disturbance Boundary,Added New Topsoil Piles <br /> 44.j <br /> 32 33 34 35 36 31 32 33 34 35 36 3 32 33 li 01<\ TR-108 Added New Sheet Number 12130116 TONY JG <br /> T3N <br /> CV) "/ONAL <br /> M N <br /> 0) M <br /> cc lZ cc evised Stockpile Footprint for 25A 417117 TONY AA <br /> MR-172 <br /> Approved 4/26/2017 <br />