Laserfiche WebLink
Page 1 <br />Review Checklist for Annual Hydrology Report <br /> <br />Mine: Peabody Sage Creek Date of review: August, 2017 <br />Permit No.: C-2009-087 DRMS reviewer: Tabetha Lynch <br /> <br />Report Year: 2016 <br />Submitted by: Peabody Sage Creek Mine (PSCM) <br />Date Received: March 29, 2017 <br /> <br />Requirement Regulation Comment <br />1. Filing frequency of <br />hydrology report <br />CDRMS regulation <br />4.05.13(4)(c) <br />The Annual Hydrology Report (AHR) is <br />submitted yearly. <br />2. Timely filing of <br />hydrology report <br />Vol 1, p. 2.04-103 of <br />CDRMS permit C- <br />2009-087 <br />AHR is required to be submitted by March 1st of <br />the subsequent water year. The water year at Sage <br />Creek Mine for 2016, is October 1st 2015 to <br />September 30th 2016. Report for the 2016 water <br />year was received on 3/29/2017. <br />3. Filing frequency of <br />NPDES Discharge <br />Monitoring Reports <br />(DMRs) <br />NPDES permit COG- <br />0048275 <br />DRMS received copies of DMRs. All filing dates <br />were met. <br />4. Timely filing of Discharge <br />Monitoring Reports <br />NPDES permit COG- <br />0048275 <br />DRMS received copies of DMRs. All filing dates <br />were met. <br />5. Sampling frequency of <br />NPDES outfalls <br />NPDES permit COG- <br />0048275 See NPDES permit for details. <br />6. Parameters to be sampled <br />for NPDES reporting <br />NPDES permit COG- <br />0048275 See DMRs for details