Laserfiche WebLink
Task description: <br />Site: Silt Pit <br />PROJECT IDENTIFICATION <br />Task #: O 1 A <br />Date: 8/23/2017 <br />User: SJM <br />DEMOLITION WORK <br />Demo of cement and remove debris <br />Permit Action: TR06 SJM <br />State: Colorado <br />County: Garfield <br />Permit/Job#: M1981202SG <br />Abbreviation: None <br />Filename: M202-01 a <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Location adjustment: 95.50 % <br />Structure or Item <br />Demolition Menu <br />Description <br />Dimensions <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />. <br />Cost <br />Demo of fuel <br />30'x 20'x 3' <br />Floor, concrete, <br />900.00 <br />SF <br />$0.59 <br />$531.00 <br />containment <br />demolition only, average <br />reinforcing - 6 in. thick <br />Push crushed cement <br />5400 cf <br />Load/haul/dump <br />200.00 <br />CY <br />$0.60 <br />$120.60 <br />into pit <br />demolished <br />materials/debris into pit - <br />Max. 1,000 ft. haul <br />Remove misc metal <br />20'D x 10' H x <br />Loading and 5 mile haul, <br />370.00 <br />CY <br />$10.71 <br />$3,962.70 <br />debris <br />40'W <br />salvage allowed - Steel <br />frame structures <br />Demo of batch plant <br />5300 sq ft <br />Demo. and on-site <br />5,300.00 <br />SF <br />$0.84 <br />$4,425.50 <br />pad <br />disposal in existing pit, 8 <br />in. thick -Max. 10,000 <br />ft. haul <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 16.00 (unadjusted): $9,039.80 location): $8,633.01 <br />